Off the wire
S. Korea freezes interest rates at record low for 2 months  • S. Korean exports fall 3.4 pct in July on soft global demand  • Urgent: Chinese yuan weakens sharply to 6.401 against USD Thursday  • Portugal's national health service witnesses exodus of doctors  • Tokyo shares open mixed on Chinese yuan's change  • IS "hit-list" includes 8 Australians, prompts warnings of lone-wolf attacks  • Retiring U.S. Army chief suggests embedding U.S. soldiers in Iraqi troops to better fight IS  • 2nd Ld-Writethru: Chinese leaders urge all-out efforts to save injured in Tianjin blast  • Dollar changes hands in lower 124 yen zone in early Tokyo deals  • Xinhua world news summary at 0030 GMT, Aug. 13  
You are here:   Home

Renewable energy powers all of Costa Rica for over 3 months

Xinhua, August 13, 2015 Adjust font size:

Costa Rica enjoyed a new period of 94 consecutive days during which all its electricity was produced from renewable sources, the Costa Rican Electricity Institute (ICE) said Wednesday.

The country never had to turn to fossil fuels at any time between May 8 and Aug. 9, the ICE said, adding that the pleasant news can be added to a previous period of 75 days with the same conditions from Jan. 1 to March 16.

According to the ICE, hydroelectric and geothermal plants provided the bulk of the energy during the 94-day time span, accounting for 89.94 percent of the total energy generated.

The rest was mostly accounted for by wind farms, which claimed 10.05 percent, while solar plants claimed 0.01 percent.

"These 94 days reflect the great diversity of our electricity grid," said Luis Pacheco, ICE's head of electricity, noting that however, thermal sources of energy will remain a necessary support system for any contingencies.

"We take advantage of our own natural resources, especially water, with efficiency and responsibility. This gives us broader independence," Pacheco said.

Pacheco said Costa Rica opened the new Garabito thermal generation plant on Aug. 10, which is powered by bunker fuel.

In 2014, Costa Rica went a total of 188 days without having to rely on thermal plants to supply the country with electricity. Endi