Off the wire
Philippine trade minister calls for expediting RCEP talks  • China's April exports up 14.3 pct, imports up 18.6 pct  • Myanmar delays building of cross-river bridge until next year  • Tokyo stocks extend gains in morning amid Macron's win in French presidential election  • Japan's Abe congratulates Macron for winning France presidential election  • 1st Ld: Xie Yang stands trial for inciting state power subversion  • Draw held for 2019 FIBA Basketball World Cup as new trophy unveiled  • Wyomingites wearing tutus protest against U.S. senator's discriminatory remarks  • Australia welcomes Chinese tourists to "go bush" in rural areas  • Foreign citizens cost Aussie taxpayers 11.1 bln USD in welfare each year: gov't analysis  
You are here:   Home

First high-speed rail in Inner Mongolia starts test run

Xinhua, May 8, 2017 Adjust font size:

The first high-speed railway in north China's Inner Mongolia Autonomous Region started test runs on Sunday to prepare for the beginning of regular use by the end of July.

The high-speed train ran at a speed of 250 to 275 km per hour on a section from Ulanqab to Hohhot, capital of the region, during Sunday's trial, according to Hohhot Railway Bureau.

The section in Inner Mongolia is part of the high-speed railway that links Hohhot to Zhangjiakou in Hebei Province, the co-host city of the 2022 Olympic Winter Games. When it is operational by the end of July, the travel time between Ulanqab and Hohhot will be shortened to 35 minutes from the current one hour.

The 286.8 km-long Zhangjiakou-Hohhot high-speed rail, with a designed speed of 250 km per hour, will be a major high-speed rail in north China upon completion.

It is expected to be completed and put into service in 2018. At that time, the Zhangjiakou-Hohhot high-speed rail will be connected to the Beijing-Zhangjiakou high-speed rail, which is under construction. The travel time from Hohhot to Beijing will be reduced from the average nine hours to within three hours. Endi