Off the wire
Bolivia meeting to mull future gas, oil industry development  • India launches probe into corporate phone-tapping scandal  • Public school in India-controlled Kashmir bars Muslim woman teacher from wearing Islamic gown, triggering major row  • More lock-up shares eligible for trade  • Poll: Majority of Chinese oppose to "dog meat festival", call for its end  • 2nd LD: 24 killed, 26 missing after floods, landslides hit western Indonesia  • India may soon grow pulses in Mozambique and Myanmar: minister  • 1st LD: 24 killed, 26 missing after floods, landslides hits western Indonesia  • China speeds up transport network building in northeast Asia  • Drone strike kills 8 militants including group commander in N. Afghanistan  
You are here:   Home

Hydro-power resumed in Tibet, one year after Nepal quake

Xinhua, June 19, 2016 Adjust font size:

Two hydro-power generators are turning again in the border county of Gyirong, southwest China's Tibet, one year after they were damaged in the 7.5-magnitude quake that struck Nepal.

The two generators provide electricity enough for household use for 10,000 people in 25 villages.

Two other generators in the power plant are expected to be repaired this year, said Ta Qing, a county official.

The devastating quake on April 25, last year, which claimed heavy casualties in Nepal, also left 26 dead in Tibet. The tremors triggered landslides on both sides of the border cutting off electricity, road transport and telecommunications.

The Gyirong Power Station, installed with a capacity of 4,000 kilowatt, was built in 2013 to satisfy the power use in the county and the customs. The plant was built to end local residents' dependence on wood for fuel. Endi