Off the wire
Avalanche kills man in Indian-controlled Kashmir  • China welcomes mediation efforts in solving Ukraine crisis  • Cheaper oil has limited impact on lifting Chinese economy: Moody's  • China Focus: Silk Road initiatives to boost China-EU ties  • France to close embassy in Yemen over security concerns  • Over 500 Boko Haram combatants killed by Nigerien army  • News Analysis: Boycott of Israeli products bears more than economic influence  • Top Chinese procuratorate exposes science related corruption  • 1st LD-Writethru-China Focus: China holds Maritime Silk Road seminar  • Turkey arrests 14 trying to enter Syria to join IS  
You are here:   Home

Pakistani PM calls for early completion of trans-Afghan gas pipeline

Xinhua, February 11, 2015 Adjust font size:

Pakistani Prime Minister Nawaz Sharif on Wednesday called for early completion of a trans-Afghan gas pipeline that will import natural gas from Turkmenistan through Afghanistan and Pakistan to India.

The prime minister presided over a ministerial-level meeting on the 1,680-km Turkmenistan-Afghanistan-Pakistan-India (TAPI) gas pipeline project in Islamabad.

The estimated cost of the project was nearly 7.6 billion U.S. dollars.

Sharif said concerned states should take all steps necessary to start the project as soon as possible as its cost would continue to increase as time passes.

"We have pinned lots of hopes with this project and want it completed as soon as possible," the prime minister said.

The gas pipeline project will supply 3.2 billion cubic feet of natural gas annually from Turkmenistan for Afghanistan, Pakistan and India.

Officials from Afghanistan, Turkmenistan and India attended the meeting. Endi